Perforated Casing vs Borehole Screens in Kenya: What Goes Down Your Borehole

What to know

  • Perforated casing is plain pipe with holes or slots cut into it, often on site. A borehole screen is factory slotted pipe that lets water in and holds sand back.
  • The screen is the only part of the borehole that water passes through, so a poor one can ruin a good water strike.
  • Sand in your water, a pump that wears out early and a yield that drops each year are the classic signs of the wrong screen or gravel pack.
  • Ask your driller three things: where the screens will sit, what slot size they are, and what gravel goes around them.

Most people planning a borehole in Kenya ask about depth and price. Very few ask what kind of pipe goes down the hole at the water strike, yet that one choice decides whether you pump clear water for twenty years or fight sand from the first month.

This guide explains perforated casing and borehole screens in plain language. It covers how each one works, where they go, what slot size means, and the questions to ask before the driller installs your casing.

Perforated casing vs borehole screen: the difference

Every borehole has a pipe lining. Plain casing has solid walls and holds the hole open, while the section opposite the water bearing layer needs openings so water can flow in.

There are two common ways to make those openings.

Perforated casing

This is ordinary casing pipe with holes drilled or slots cut into it, usually by hand with a grinder or saw. It is cheap and quick, which is why some drillers use it.

The problem is that hand cut openings are uneven in width. Some are too wide and let sand through, the total opening area is usually small, and cutting many holes weakens the pipe wall.

Factory slotted screen

A screen is factory pipe with many narrow slots of the same width, which a machine cuts along its length. The slot width is a fixed size, such as 0.5 or 1 millimetre, so the driller can match it to the ground.

Because the slots are uniform and numerous, water enters slowly over a wide area. Slow entry carries less sand and is gentler on the aquifer around the borehole.

FeaturePerforated casingFactory slotted screen
How it is madeHoles or slots cut into plain pipe, often on siteMachine cut slots of one fixed width
Opening sizeUneven, hard to controlUniform, chosen to suit the ground
Open areaUsually smallHigher, so water enters more slowly
Sand controlPoor in sandy or weathered groundGood when matched with gravel pack
Pipe strengthWeakened by cuttingDesigned for the load
Best useRarely the right choice for a production boreholeHomes, farms, schools and commercial boreholes

Why the screen matters so much

All the water you will ever pump passes through a few metres of screen. If those openings are too wide, fine sand and silt travel with the water into the pump, the tank and your taps.

Sand acts like sandpaper on a submersible pump. It wears the impellers, cuts pump life short and can fill the bottom of the borehole until the water strike is buried.

If the openings are too small or too few, the opposite happens. Water struggles to enter, the level inside the borehole drops further than it should, and you get less water than the aquifer could give. That is why two boreholes on neighbouring plots can show very different results in test pumping.

Bonvic rig operator working the rig controls during drilling
The drilling log recorded at the rig tells you where the water strikes are and what the ground is made of.

Screen or perforated pipe? Quick checker

Answer three questions from your drilling log or survey report. The checker tells you what to ask your driller before the casing goes in.

Pick your answers and press the button.

Where screens go in the borehole

A well built borehole is a column of pipe with screens only where they are needed. Plain casing runs from the surface down through dry or loose layers, and screens sit opposite the water strikes recorded during drilling.

A typical string from top to bottom looks like this:

  1. Plain casing from the surface through topsoil, clay and dry zones, so loose material cannot fall in.
  2. Screen opposite each main water bearing layer the driller logged.
  3. Plain casing between water strikes where the ground is dry or unstable.
  4. A short sump and end cap at the bottom, which catches any settling fines.

Shallow, seasonal water strikes are often sealed off behind plain casing on purpose. They dry up in drought and can carry surface contamination, a point we cover in our guide to borehole yield during drought.

This is why the screen plan should come from the actual drilling log, not from a fixed design. Two boreholes of the same depth can need screens at quite different levels.

Slot size and gravel pack

The slot size is the width of each opening in the screen. The aim is simple: let water through while stopping most of the surrounding grains.

A good driller collects samples of the cuttings as the hole goes down. Those samples show how fine or coarse the water bearing layer is, and that guides both the slot width and the gravel used around the screen.

What the gravel pack does

The space between the borehole wall and the screen is filled with clean, rounded gravel of a set size. This layer acts as a filter so fine aquifer grains are trapped before they reach the slots.

Crushed ballast or mixed builders gravel is a poor substitute because its sharp, uneven pieces pack badly and let fines through. You can read more in why gravel matters in borehole drilling.

Development matters too. After the screen and gravel are installed, the borehole should be developed by pumping or air surging until the water runs clear. This pulls the finest material out of the gravel pack so it settles into a stable filter.

PVC or steel screens?

Most domestic and farm boreholes in Kenya use uPVC casing and screens because they do not rust and suit most water types. Steel is chosen for very deep holes or special conditions, and we compare both in our PVC vs steel casing guide.

New to the topic? Start with what casing is in borehole drilling and come back here.

Signs your screen or gravel pack is failing

  • Water comes out cloudy or gritty, especially when the pump first starts.
  • Sand collects at the bottom of the storage tank.
  • The pump wears out much sooner than its expected life.
  • Yield drops season after season even though nearby boreholes hold steady.
  • The measured depth of the borehole gets shallower because sediment is filling it.

Some of these problems can be fixed by cleaning, redevelopment or relining. Our page on borehole repair and rehabilitation explains the options.

Questions to ask your driller before casing goes in

  1. Will you use factory slotted screen or cut the pipe on site?
  2. Where exactly will the screens sit, and can I see the drilling log?
  3. What slot size are you using, and why?
  4. What gravel goes around the screen, and how much?
  5. How will you develop the borehole before test pumping?
  6. Will the quote list casing and screen lengths separately?

A driller who answers these clearly is usually one who builds boreholes to last. For a wider checklist, see how to choose a borehole drilling company, and for budgets see how much borehole drilling costs in Kenya.

Want a borehole built to pump clear water?

Send us your location and what the water is for. The Bonvic team will book the survey and send a written quote that lists casing and screens line by line.

WhatsApp 0727 666 444Call 0797 000 555

Frequently asked questions

What is perforated casing in a borehole?

Perforated casing is plain casing pipe with holes or slots cut into it so water can enter. It is usually cut by hand, which makes the openings uneven and often lets sand through.

Is a borehole screen better than perforated pipe?

In most Kenyan boreholes, yes. A factory slotted screen has uniform openings matched to the ground and more open area, so it gives clearer water and protects the pump.

What slot size should a borehole screen have?

It depends on the water bearing layer and the gravel pack. Driller samples of the cuttings guide the choice, and domestic PVC screens are often around 0.5 to 1 millimetre.

Why is my borehole pumping sand?

Common causes are screens with openings that are too wide, a missing or poor gravel pack, a borehole that was not developed properly, or a pump set too close to the screen.

Can a sandy borehole be fixed?

Often it can. Options include cleaning and redevelopment, installing a smaller liner screen inside the old one, or adjusting the pump depth, depending on what the inspection finds.

Sources: Bonvic drilling practice; Bonvic gravel pack guide; general water well construction guidance on screen selection and development.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top