- A hydrogeological survey with Bonvic Drilling costs KES 50,000, or KES 40,000 for jobs booked by 30 November 2026.
- It includes the site visit, geophysical readings, the marked drilling point and a signed report.
- Add about KES 85,000 for permits, so you need about KES 135,000 before drilling starts.
- The survey is a small share of the total. For a 200 metre borehole it is under 4% of the cost.
Most people asking about a borehole start with one question: how much is the survey? The answer is simple, but it helps to see where the survey fits in the full budget.
This guide explains what you pay for, what the report gives you, and what comes next. Use the calculator to see your full budget before the pump.
BLACK NOVEMBER 2026 OFFER
Hydrogeological survey KES 40,000. Drilling KES 6,500 per metre with PVC casing or KES 6,700 per metre with steel casing, for jobs booked by 30 November 2026.
See the offer and estimate your total or call 0727 666 444.
Survey and pre drilling budget calculator
Set your expected depth and casing. The calculator adds the survey, permits and drilling so you see the full budget before the pump.
What the KES 50,000 Covers
| Part of the survey | What you get |
|---|---|
| Site visit | Our surveyor walks the plot and checks the ground, nearby boreholes, slope and access for the rig. |
| Geophysical readings | Electrical resistivity along profile lines and vertical electrical soundings (VES) to find water bearing layers. |
| Marked drilling point | The best spot to drill on your land, marked on site. |
| Signed report | Expected depth, likely yield and water quality risks such as fluoride or salt. You use it for your WRA permit. |

To understand what each part of the report means, read our guide on how to read a hydrogeological survey report.
Full Budget Before Drilling
The survey is the first payment, but not the only one before the rig arrives. Here is the full picture at our standard rates.
| Item | Standard rate | Black November (booked by 30 Nov 2026) |
|---|---|---|
| Hydrogeological survey | KES 50,000 | KES 40,000 |
| WRA and NEMA permits | About KES 85,000 | About KES 85,000 |
| Drilling per metre | KES 6,500 to 7,200 | KES 6,500 PVC or KES 6,700 steel |
| 100 m borehole, before pump | KES 785,000 to 855,000 | KES 775,000 PVC |
| 150 m borehole, before pump | KES 1,110,000 to 1,215,000 | KES 1,100,000 PVC |
Drilling includes casing, gravel packing, test pumping and a water analysis. The pump, tank and power come after, and our borehole drilling cost guide covers those.
Why the Survey Is Worth It
A borehole in Kenya often costs over KES 1 million to drill. The worst result is a dry hole, or one that gives too little water to use.
The survey lowers that risk by showing the best point to drill and how deep to go. It also flags water quality problems early, so you can plan treatment before you pay for drilling.
Depth changes a lot from county to county. See our borehole depth by county guide for typical ranges in your area.
The Risk of Skipping or Cheap Surveys
- No permit. WRA asks for the survey report, so drilling without one can stop your project.
- Wrong spot. A few metres can decide between a strong borehole and a weak one.
- Wrong depth. Drilling too shallow misses the main aquifer, and drilling too deep wastes money.
- Surprise water quality. High fluoride or salt found after drilling is costly to fix.
We explain more in the hidden cost of cheap borehole drilling. If you are about to buy land, read why to survey before buying land.
How the Survey Works
- You send your location on WhatsApp and we confirm the date.
- Our surveyor visits the plot and takes the resistivity readings.
- The data is analysed and the best drilling point is marked.
- You receive the signed report with depth, yield and water quality notes.
- We help you apply for the WRA permit and plan the drilling.
For a deeper look at the methods, read geophysical survey for borehole drilling and our main guide to what a hydrogeological survey is.
Book your hydrogeological survey
WhatsApp us your location (village and sub county). We will confirm the survey cost and a date for your area. Drilling across Kenya since 2010.
WhatsApp 0727 666 444Call 0797 000 555Hard rock areas need a good survey. See how this plays out in our borehole drilling in Makueni County guide.
Frequently Asked Questions
How much does a hydrogeological survey cost in Kenya?
With Bonvic Drilling a full hydrogeological survey costs KES 50,000. It covers the site visit, the geophysical readings, the marked drilling point and the signed report. For jobs booked by 30 November 2026 the Black November price is KES 40,000.
Do I need a survey before drilling a borehole?
Yes. The Water Resources Authority asks for a hydrogeological survey report when you apply for a permit to drill, under the Water Act 2016. The survey also tells you where to drill and how deep to go.
What else do I pay before drilling starts?
Plan for about KES 85,000 for permits on top of the survey. That makes about KES 135,000 before any drilling at our standard rates.
Is the survey cost part of the drilling price?
No. The survey is paid first and on its own, because it decides whether and where to drill. Drilling with Bonvic then costs KES 6,500 to 7,200 per metre, including casing, gravel packing, test pumping and a water analysis.
Can a survey guarantee water?
No survey can promise water, but it greatly lowers the risk of a dry or weak borehole. It shows the most likely water bearing layers, the best point to drill and the expected depth.
How do I book a survey with Bonvic?
Send your location on WhatsApp to 0727 666 444 or call 0797 000 555. We will confirm the cost for your area and a survey date.
Sources: Bonvic Drilling survey and drilling rates as published on bonvicdrilling.com (November 2026). Permit requirement: Water Resources Authority and the Water Act 2016.
Choosing a driller? Use our eight checks to find the best borehole drilling company in Kenya for your project, with 2026 prices and red flags to avoid.



