Quick answer: boreholes around Eldoret are usually 120 to 150 metres deep, and up to 200 metres along the Elgeyo escarpment. With Bonvic, air drilling usually costs KES 6,500 to 7,200 per metre including casing, gravel packing, test pumping and a water analysis. For jobs booked by 30 November 2026, the Black November rates are KES 6,500 with PVC casing and KES 6,700 with steel casing.
Uasin Gishu feeds much of Kenya, yet Eldoret’s piped water falls short of demand and farms rely on the rains. This guide covers the geology, how deep and how much water to expect, costs and permits.
BLACK NOVEMBER 2026 OFFER
Hydrogeological survey KES 40,000. Drilling KES 6,500 per metre with PVC casing or KES 6,700 per metre with steel casing, for jobs booked by 30 November 2026.
WhatsApp for a quoteCall 0727 666444See the offer and estimate your total
Borehole cost estimator for Uasin Gishu
Most Eldoret boreholes fall between 120 and 150 metres, and escarpment sites can go to 200 metres. Move the slider to your expected depth and pick what the water is for.
Based on Bonvic air drilling rates of KES 6,500 to 7,200 per metre from 2026 client quotes. Your exact depth and price are confirmed in writing after the survey.

Why a Borehole Makes Sense in Uasin Gishu
Eldoret's water company ELDOWAS produces about 43,000 cubic metres a day against demand of about 60,000, a shortfall of 17,000 cubic metres every day (Kenya Investment Authority). ELDOWAS has run rationing schedules since June 2025 (Uasin Gishu News).
Water has also become more expensive. In October 2025 ELDOWAS raised tariffs by over 300%, to about Sh130 per cubic metre (The Star). Residents have also complained of discoloured water as the dams silt up (The Standard).
The new Sh1.3 billion Kipkaren dam will add about 23,000 cubic metres a day (The Standard). Until it is running, and for farms beyond the pipes, a private borehole is the reliable option. Compare the numbers in our borehole vs county water cost guide.
Geology: Lava Over Ancient Rock
Most of Uasin Gishu sits on a plateau of phonolite lava laid over very old gneiss basement rock. Tuffs, agglomerates and sediments lie on top, under black cotton soil in many places (WRMA survey, Moiben).
Water is found where the lava is fractured, weathered or jointed, and the rains of about 1,100 mm a year recharge it. Under Eldoret itself, a deep confined aquifer in the phonolite is fed from the eastern highlands (Rural Focus for The Nature Conservancy, 2019).
The land drops from about 2,700 m at Timboroa to about 1,500 m at Kipkaren, with Eldoret at 2,085 m (County Integrated Development Plan). Height matters, because a deep water level means a bigger pump.
How Deep and How Much Water
| Area | Typical depth | Typical yield | Source |
|---|---|---|---|
| Eldoret town | 120 to 150 m | Median 2.3 cubic metres an hour | Rural Focus 2019 |
| Elgeyo escarpment | 110 to 200 m | 1 to 7 cubic metres an hour | Rural Focus 2019 |
| Moiben (Kipkorgot survey) | Recommended up to 200 m | 1 to 6 cubic metres an hour expected | WRMA 2013 |
| County wide | Varies | Average 3.77, range 0.12 to 31.24 cubic metres an hour | Rural Focus 2019 |
Only 10 of 101 pumping tests around Eldoret gave more than 10 cubic metres an hour. That is plenty for a home, school or dairy unit, but large irrigation needs careful siting, which is exactly what the geophysical survey is for.
Water Quality
Survey reports in the area describe the water as anywhere from mineralised to good and advise checking conductivity while drilling (WRMA survey). A 2026 report from the same phonolite in neighbouring Keiyo North notes that fluoride may be raised but is not expected to pass the 1.5 mg/L limit (Koisabul report).
Every Bonvic borehole includes a water analysis. See the 7 essential borehole water tests for what we check.
Sub Counties
| Sub county | Population (2019) |
|---|---|
| Turbo | 267,273 |
| Soy | 229,094 |
| Kapseret | 198,499 |
| Moiben | 181,338 |
| Kesses | 148,798 |
| Ainabkoi | 138,184 |
| Uasin Gishu County | 1,163,186 |
Population from the 2019 census via City Population. The county says it drilled 25 public boreholes in 2023/24, against a target of 30 (County Annual Development Plan).
Boreholes for Uasin Gishu Farms
Farmland covers about 81% of the county, with maize on about 102,753 hectares, wheat on 16,867 hectares and some 336,122 dairy cattle (CIDP). Rain falls mainly from March to September, so dry months hit dairy and horticulture hardest.
A borehole keeps cows drinking and irrigation running through the dry months. See borehole irrigation in Kenya and the pump sizing guide to plan your water.
Permits
Uasin Gishu falls under the WRA Lake Victoria North Basin Area (WRA). You need a hydrogeological survey report, WRA authorisation and NEMA and county approvals before drilling.
We handle the paperwork for about KES 85,000. See borehole permits in Kenya for every step.
How a Uasin Gishu Borehole Project Runs
- Hydrogeological survey. KES 40,000 during Black November (normally KES 50,000). Marks the drilling point, expected depth and yield.
- Permits. WRA, NEMA and county approvals, about one month.
- Site access. Black cotton soil turns to mud in the long rains, so we plan the rig route and timing.
- Drilling. A typical domestic borehole takes a few days on site.
- Casing, gravel pack and sanitary seal.
- Test pumping and water analysis. Safe yield and water quality, in writing.
- Pump and solar installation. Sized from the test results.
Planning a borehole in Uasin Gishu?
WhatsApp us your location (village and sub county). We will tell you the expected depth and a cost range for your area. Drilling across Kenya since 2010.
WhatsApp 0727 666 444Call 0797 000 555Related: Drilling in Western Kenya? See our guide to borehole drilling in Kakamega, with a cost estimator for all 13 sub counties.
For the Mt Elgon side, see borehole drilling in Bungoma County.
Related: Borehole drilling in Trans Nzoia County (Kitale)
Related: Borehole drilling in Nandi
Choosing a driller? Use our eight checks to find the best borehole drilling company in Kenya for your project, with 2026 prices and red flags to avoid.
Frequently Asked Questions
How deep are boreholes in Eldoret?
Boreholes in and around Eldoret are typically 120 to 150 metres deep, drawing from a deep aquifer in phonolite lava. Along the Elgeyo escarpment, boreholes of 110 to 200 metres are common.
How much does borehole drilling cost in Uasin Gishu?
With Bonvic, air drilling usually costs KES 6,500 to 7,200 per metre including casing, gravel packing, test pumping and a water analysis. During Black November 2026 it is KES 6,500 with PVC casing or KES 6,700 with steel casing for jobs booked by 30 November. Add the survey and about KES 85,000 for permits.
How much water does an Eldoret borehole give?
A 2019 study of 101 pumping tests found a median yield of 2.3 cubic metres an hour, enough for a home and a small farm. Only 10 of the 101 gave more than 10 cubic metres an hour, so the survey point matters.
Is borehole water in Uasin Gishu safe to drink?
Often, but test it. Survey reports in the area describe water quality from mineralised to good, and fluoride can be raised in Rift Valley volcanic rock. Every Bonvic borehole includes a water analysis.
Which WRA office handles Uasin Gishu permits?
Uasin Gishu falls in the Water Resources Authority Lake Victoria North Basin Area. We prepare and submit the permit file after the survey.



